Powers Solar Arch Semi-Cantilevered Tilt Down Plan View
Drilled Pier Footing
Optional Spread Footing
Bracing at Purlins • Allowable Holes in Purlin
End Cap at Purlin
Our Gator Clamp held fast during 100+ mph wind loads during a summer storm in St. Louis (August 2020). The aluminum solar panel frame failed before our Gator Clamp would let go!